Fleming Island Medical Plaza Sells, Nearly Doubles In Value
The campus spans 7.5 acres and includes two buildings completed in 2010.
This author has not written his bio yet.
But we are proud to say that ADMIN contributed 853 entries already.
The campus spans 7.5 acres and includes two buildings completed in 2010.
The 24,000-square-foot addition includes six operating rooms, with room to expand to eight, and a prep and recovery area.
In Miami, the draw is especially strong for cosmetic surgery, bariatric treatment and other procedures that can be packaged around convenience, shorter wait times and a recovery setting that feels more like a destination than a hospital corridor.
Medical users are gravitating toward buildings that already contain the expensive components needed for clinical use, especially imaging-related improvements and other specialized systems. In today’s environment, replicating that infrastructure through new construction can require major capital and much longer lead times.
The project is being described as Southwest Florida’s largest healthcare construction project to date.
